Primary Bathroom Renovation in Prewar Duplex on the Upper West Side, NYC

31 W 93rd St

Project Overview

TYPE:  Primary Bathroom Renovation in a Prewar Duplex

LOCATION: UWS  – 31 W 93rd Street, NYC

CONSTRUCTION DURATION: 2 months

More Prewar Reno Before & Afters, Walkthrough Videos

The Full Story Behind this Prewar Primary Bathroom Renovation:

This second-phase renovation for the Primary Bath completed the contemporary transformation of this duplex apartment. We managed to put the finishing touches on a few remaining items on the first floor, but the main attraction was the Primary Bathroom gut renovation. The design included integrating the room’s built-ins and changing everything else, including the under-counter luxurious soaking tub, separate double vanities, Toto toilet, and a large shower—perfect for typical NYC bathroom spaces.

Key Renovation Highlights:

The primary bath layout actually worked but needed a gut renovation to replace the shower pan/floors with proper waterproofing, as it had never been done. Access valves were not “accessible” and were located behind the tub walls! Basically, all new plumbing rough-ins were required. Along with this, we changed everything with gorgeous contemporary porcelain tile, a textured accent wall of the same material, new modern plumbing fixtures from California Faucets, radiant heated floors, new lighting, updated medicine cabinet doors and casing, custom vanities, and a stunning Victoria and Albert soaking tub!

Adventures in Design Build – Before & After Videos

Don’t miss the highlights from this primary bathroom renovation in a prewar duplex. I’ve included a video with before-and-after photos, as well as a video walkthrough. Each video and photo highlights the transformation, from the initial challenges to the final reveal.

Project Result: A Primary Bathroom Transformation

The transformation of this primary bathroom achieved the “spa” quality aesthetic we designed, and although it was just one room in this project, the results were amazing! The clients were ecstatic! Now, this second phase has brought the whole apartment together, and they absolutely love it.

More Prewar Reno Before & Afters, Walkthrough Videos

For those of you who love the ups and downs of renovation transformations, don’t miss my prewar project playlists featuring before-and-after videos of some of my most challenging prewar apartment renovations, as well as a prewar walkthrough video playlist too.

If you love this Upper West Side Primary Bathroom Remodel as much as we do, and you’re ready to renovate, contact Paula McDonald Design Build & Interiors today!

Get Started